St Paul's Square
Corefast enabled Shepherd Construction to save 21 weeks on a 105-week programme at its St Paul’s Square, Liverpool development. Its use reduced the number of tower cranes required on site from two to one and delivered significant cost savings.

London School of Economics
Corefast, the innovative modular system for the construction of structural building cores, helped speed up the installation of the two lift cores in this exciting remodelling of a fine Edwardian building in central London.

Birmingham 1
Birmingham 1 is an impressive student halls of residence scheme in south-west Birmingham which houses over 600 students in a state-of-the-art complex. Corefast contributed significantly to the project by reducing the number of structural cores required and by enhancing health and safety on site.

One Basinghall Avenue
A prestigious office building in the heart of London's financial district has benefited from the use of Corefast. This innovative modular building core system from Corus has enabled the structural core to be completed five times faster than a traditional concrete core.

Forty Springardens
This high class office scheme in Manchester’s financial district has been carefully designed to blend with the historic buildings that surround it. Care has also been taken to embrace the latest techniques aimed at improving construction efficiency, hence the selection of Corefast, an innovative modular system for the construction of structural building cores.

Southgate
Corefast was specified for a Scottish residential developer’s largest-ever project, the exciting Southgate scheme in Glasgow, comprising 335 apartments. Corefast helped speed up construction on site as the contractor benefited from the accuracy of the pre-installed fixings enabling rapid connections to be made to the steel frame.

Dundrum Town Centre
Corefast’s high strength and speed of construction were the key reasons why the system was used in the new Dundrum Town Centre shopping complex, near Dublin. Corefast was specified to build the lift core in the stunning cinema complex, enabling the architect’s vision of a scenic lift with elegant, slender walls to be achieved.