Skip navigation

Bi-Steel

Birmingham 1

Installed - October 2006

Birmingham 1 is an impressive student halls of residence scheme in south-west Birmingham which houses over 600 students in a state-of-the-art complex. Corefast contributed significantly to the project by reducing the number of structural cores required and by enhancing health and safety on site.

Project Summary images - 1.jpgProject Summary images - 14.jpg

The dramatic 18-storey tower that is the centrepiece of the Birmingham 1 development incorporates Corefast which was used to construct the central lift/stair core.

In addition to saving six weeks on the construction programme, Bi-Steel’s high strength and rigidity meant that the four reinforced concrete cores originally specified could be replaced by a single Corefast core and supplementary conventional vertical bracing. 

Corefast also offered health and safety benefits by eliminating the need for temporary formwork and facilitating safe, enclosed working at heights. 

Technical Hotline

+44 (0) 1724 40 50 60
Or click here to contact us 

Fact file

Client:

Opal Property Group

Architect:

LOC Associates

Structural Engineer:

Tier Consult

Main Contractor:

Ocon Construction Ltd

Steelwork Contractor:

Henry Smith (Constructional Engineers) Ltd

Corus Bi-Steel

Crowthorne Business Est

Crowthorne

Berks RG45 6AW

United Kingdom


T  +44 (0)1344 751670

F  +44 (0)1344 751671

E  bi-steel@ corusgroup.com