Bi-Steel
Forty Springardens
Installed - February 2006
This prestigious office scheme in Manchester’s financial district has been carefully designed to blend with the historic buildings that surround it. Care has also been taken to embrace the latest techniques aimed at improving construction efficiency, hence the selection of Corefast, an innovative modular system for the construction of structural building cores.


Forty Springardens is a nine-storey structure with two basement storeys below ground.
Corefast was specified for the central four-bank lift core and an additional lift/stair core, and was chosen in preference to alternative traditional construction techniques.
Corefast was ideal for this busy inner city site as it dramatically increased build efficiency - modules were delivered just-in-time, reducing site congestion, speed of construction was increased and the benefits of one-trade working were fully realised.
Fact file
Client:
Langtree Group plc
Architect:
Aedas Architects
Structural Engineer:
White Young Green
Main Contractor:
Balfour Beatty
Steelwork Contractor:
APC Engineers
Corus Bi-Steel
Crowthorne Business Est
Crowthorne
Berks RG45 6AW
United Kingdom
T +44 (0)1344 751670
F +44 (0)1344 751671








