Southgate

Installed - November 2005

Corefast was specified for a Scottish residential developer’s largest-ever project, the exciting Southgate scheme in Glasgow, comprising 335 apartments. Corefast helped speed up construction on site as the contractor benefited from the accuracy of the pre-installed fixings enabling rapid connections to be made to the steel frame.

Project Summary images - 1.jpgProject Summary images - 6.jpg

In the first phase of the Southgate project, which consisted of two blocks of six and seven storeys, four Corefast cores were installed in just four working days.

The project team was particularly impressed by the accuracy of Corefast’s off-site component manufacture, which delivered plumb lift shafts, with all the doors and service openings pre-cut off site. 

By selecting Corefast, the contractor was able to construct the cores with minimum disruption and benefited from a faster build sequence.

      

Technical Hotline

+44 (0) 1724 40 50 60
Or click here to contact us 

Fact file

Client:

Westpoint Homes

Architect:

Young & Gault

Structural Engineer:

Goodson Associates Ltd

Main Contractor:

Beechwood Development Company (Scotland) Ltd

Steelwork Contractor:

Ellrod Engineering

Corus Bi-Steel