London School of Economics

Installed - January 2007

Corefast, the innovative modular system for the construction of structural building cores, helped speed up the installation of the two lift cores in this exciting remodelling of a fine Edwardian building in central London.

Project Summary images - 1.jpgProject Summary images - 5.jpg

The London School of Economics and Political Sciences has created an imaginative new Academic Building comprising new lecture theatres, classrooms, research facilities and administration offices in an imposing period structure adjacent to Lincoln’s Inn Fields, London.

The interior of the existing building was completely removed with the elegant façade retained and repaired.

Creating a completely new nine-storey plus basement steel frame structure within the existing façade presented many challenges to the architects and main contractor. Corefast helped both to meet these, enabling them to reduce the installation time required to construct the two lift/stair cores to just two weeks, compared with 14 weeks had reinforced concrete been used.

Technical Hotline

+44 (0) 1724 40 50 60
Or click here to contact us 

Corus Bi-Steel

Crowthorne Business Est

Crowthorne

Berks RG45 6AW

United Kingdom


T  +44 (0)1344 751670

F  +44 (0)1344 751671

E  bi-steel@ corusgroup.com


Fact file

Client:

London School of Economics & Political Sciences

Architect:

Grimshaw Architects

Structural Engineer:

Alan Baxter & Associates

Main Contractor:

Geoffrey Osborne Ltd

Steelwork Contractor:

Bourne Steel Ltd

Corefast Erector:

McGee Group Ltd