Skip navigation

Healthcare buildings

Hospital design presents construction firms with unique challenges. The buildings must be flexible and adaptable in use, meet heavy servicing requirements, satisfy any vibration requirements and still be constructed in double quick time. Recent hospital projects have demonstrated that steel construction is well placed to meet these demands.

Breathing Space

Breathing Space

A steel frame was chosen for speed of construction and for its ability to easily integrate with structural elements, for example the gluelam roof and external walling. The steel structure provides straight-forward structural connections between these elements.

St Richards Hospital

St Richards Hospital

The Slimdek flooring system proved to be the healthy choice for the state-of-the-art Diagnosis and Treatment Centre at St Richard's Hospital, Chichester.

Sunderland Royal Hospital

Sunderland Royal Hospital

Sunderland Royal Hospital's steel-framed five-storey extension was opened Spring 2006. The 15,000m² development incorporates three general and two ultra-clean operating theatres as well as sterilising facilities for the theatres and a mortuary.

 

Technical Hotline

+44 (0) 1724 40 50 60
Or click here to contact us 

Construction Services & Development

PO Box 1

Brigg Road

Scunthorpe

DN16 1BP

United Kingdom


T  +44 (0) 1724 405060

F  +44 (0) 1724 405600

E  construction@ corusgroup.com


My Order

 
Account Details

No
Yes