 |
| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z |
 |
 |
| GALVANISE |
| Process for coating steel sections with zinc in order to provide corrosion protection from aggressive environments. (Hot dipped, spun galvanizing.) |
 |
| GANTRY |
| A steel structure for supporting an overhead crane assembly. |
 |
| GANTRY GIRDER |
| Beam supporting an overhead traveling crane. (Crane beam.) |
 |
| GAS SHIELDED WELDING |
| An automatic or semi-automatic welding process where the arc is shielded by an inert gas. (MIG=metal inert gas, CO2=Carbon dioxide) |
 |
| GRADE 4.6 BOLTS |
| Bolts with a UTS of 400 N/mm2 and a yield stress which is 60% of this. |
 |
| GRADE 8.8 BOLTS |
| Bolts with a UTS of 800 N/mm2 and a yield stress which is 80% of this. |
 |
| GRADIENT |
| The fall or rise per unit length of land, railway, road. |
 |
| GRID |
| A rectangular layout of straight lines used for locating points on a plan. (Grid lines for stanchion layout.) |
 |
| GRIP LENGTH BOLT |
| A layer of parallel steel beams set on a concrete foundation in order to spread heavy concreted loads over a wide area. (Grillage beam, two tier grillage.) |
 |
| GROUT |
| A mixture of Portland cement and water. (Grouts are used to fill the space between the underside of a base plate and the top of a concrete foundation.) |
 |
| GUSSET |
| Fabricated plates used to make joints between members forming a truss or lattice frame. (Bolted gusset, welded gusset.) |