Coordination between the designer and contractor will ensure that construction work proceeds safely and with maximum efficiency. The CDM 2007 regulations are of particular importance during the construction phase of a project.
The decking contractor should normally prepare detailed decking drawings and an erection method statement which should identify methods of and restrictions to adjacent working. These should be discussed and agreed with the principal contractor.
Work should be planned so that no other trades or stored materials are permitted onto the deck and no other works are carried out immediately above or below the working area until it has been completed and handed over.