Steel still the first choice framing solution

Steel still the first choice framing solution

The chart above tracks the average cost per square metre for the steel and the concrete frame and floor options. The figures are derived from the cost study conducted by Davis Langdon and are tracked using the DTI cost indices.

In their latest survey (Q1 2008), the concrete frame and floor options cost an average of £169.92 per square metre. This is £24.83 more than the average steel cost of £145.09 per square metre.

In comparison with 1995, the cost differential between the average steel and concrete options is actually wider today. The steel options were £14.03 cheaper in 1995 whilst they represent a saving of £24.83 per square metre in 2008.

The cost of a frame and floor is a relatively small part of the total cost of a development. However, the selection of a steel frame reduces timescales and has a beneficial effect on other major variable cost items such as foundations, cladding and services, leading to significant cost savings for the overall project.

Building A

 Building A  Composite steel beam & slab  Slimdek (steel shallow floor solution) Long span cellular beams  Reinforced concrete flat slab  In-situ concrete frame with precast floors 
 Frame & floor cost (£/m²GFA)  113  142  139  162  134
 Frame construction time (weeks)  7  6  6  8  8
 Overall building cost (£/m² GFA)  1433  1430  1485  1488  1477
 Overall construction time (weeks)  42  40  41  44  43

Building A Frame and Floor Costs

This chart tracks the cost per square metre for various frame and floor options for Building A: a regional office block located in Manchester.

Composite beam and slab is the most competitive option costing £113 per square metre whilst the Reinforced concrete flat slab is the most expensive at £162 per square metre.

There’s little difference in price between the other three options of Slimdek, Cellular beam, and Insitu frame with precast floors.

Building B

 Building B  Composite steel beam & slab  Slimdek (steel shallow floor solution)  Long span cellular beams  Reinforced concrete flat slab   Post tensioned ribbed concrete slab
 Frame & floor cost (£/m²GFA) 140  170 170  189  202
 Frame construction time (weeks)  13  13  13  18  19
 Overall building cost (£/m² GFA)  1940  1943  1958  2035  2013
 Overall construction time (weeks)  67  67  66  76  76

Building B Frame and Floor Costs

This chart tracks the cost per square metre for various frame and floor options for Building B: a prestige company headquarters located in London.

Again Composite beam and slab is the most cost effective framing option at £140 per square metre. This compares with £189 for Reinforced concrete flat slab and £202 for Post tensioned ribbed concrete flat slab.

The steel options of Slimdek and Cellular beam also have significant cost savings for this building. In comparison with the cheapest concrete option, both systems offer savings of £29 per square metre.

              

 